| |

Design, Production
and Construction for the piping system and facility of various plants and
buildings, duct, pressure vessels, tanks and steel structure.
- Cooling and Heating Facility
- Air Handling Facility
- Sanitation Equipment
- Environment Facility for Water Treatment - wastewater and Contaminated
Water
- Products for Steel Structure, Duct, Tank
Career
|
|
Year
|
Field
|
Construction list
|
Remark
|
|
|
1993
|
111GOLDSTAR
111BO-IN Medica
111SEHAN Electronics
111DEAWOO Electronics
111HEG
111Yuhan-Kimberly
|
111Main piping facility and
HVAC plant, besides
111Machine install and U/T piping facility,
besides
111Main line piping facility in factory,
besides
111Main steam piping facility in factory,
besides
111Piping facility for waste-water treatment,
besides
111Main piping facility in factory, besides
|
6 cases
2 cases
1 cases
1 cases
1 cases
1 cases |
|
|
1994
|
111SEHAN Electronics
111BO-IN Medica
111Suttong
111DEAWOO Electronics
111HEG
111LG Electronics
|
111Piping facility, besides
111Main steam piping facility in factory,
besides
111BOILER Install and main piping facility,
besides
111Cantilever install, main piping facility,
besides
111Piping and duct facility, besides
111H2 reservoir/H2 GAS piping facility in
whole factory, besides
|
4 cases
3 cases
5 cases
5 cases
8 cases
25 cases
|
|
|
1995
|
111Suttong
111DEAWOO Electronics
111LG Cable
111HEG
111LG Electronics
111Chang-sa project
111Indonesia project
|
111
111Piping facility around crusher, besides
111TV forming machine/ N2 piping facility,
besides
111U/T piping facility for Heating and removal,
besides
111NCP VA duct facility, besides
111Processing water heating facility/ piping(New2
proj.), besides
111Processing water heating facility/ piping(China),
besides
111Processing water heating facility/ piping
facility, besides
|
3 cases
5 cases
1 cases
10 cases
35 cases
1 cases
1 cases
|
|
|
1996
|
111LG Cable
111HEG
111LG Construction
111LG Electronics
111Chang-sa project
111Indonesia project
|
111
111Power cable #3 U/T piping facility, besides
111Main piping facility in factory, besides
111HF reservoir install and main piping
facility(display), besides
111(WVT painting) processing water heating
facility/piping, besides
111Processing water heating facility/ piping(China),
besides
111Processing water heating facility/ piping
facility, besides |
1 cases
17cases
1 cases
349cases
1 cases
1 cases
|
|
|
1997
|
111LG Cable
111HEG
111DEAWOO Electronics
111Now-Tec.
111HYOSUNG
111LG Electronics
111LG Electronics
111LG Electronics
111LG Electronics
111Chang-sa project
111England project
|
111Main piping facility in factory, besides
111Acid washing facility install, beside
111Main piping facility in factory, besides
111Piping facility for chiller, besides
111HVAC facility and main piping facility
in textile factory,besides
111City gas facility, besides
111FLATRON city gas facility/ piping facility,
besides
111FLATRON painting facility/ piping facility,
besides
111HVAC facility, piping facility for control,
besides
111Piping facility in CS Electron gun project(China),
besides
111Processing water heating facility / piping
facility, besides |
5 cases
15 cases
1 cases
1 cases
1 cases
298 cases
58 cases
1 cases
1 cases
2 cases
2 cases
|
|
|
1998
|
111SEHAN Construction
111HEG
111DEAWOO Electronics
111HYUNDAI
111LG Info. and Com.
111LG Micron
111LG Cable
111LG Electronics
111LG Electronics
111LG Electronics
111Kumi Tax Office
111England Project
|
111Machine facility, Piping facility, besides
111W/D exhaust duct facility in S3 line,
besides
111Modification GAS facility, besides
111HVAC facility and piping facility in
C/R, besides
111Piping facility of city gas, besides
111Piping facility for machine
111Incombustibility facility, piping facility
of air and gas, besides
111Facility of waste heat recovery, piping
facility, besides
111O2,N2,H2 reservoir for city gas, piping
facility of gas, besides
111Piping facility of flatron chillier,
AHU, cooling tower, besides
111Infusing city gas and installing gas
boiler, besides
111SUS guide rail facility in LG Engineering,
besides |
1 cases
3 cases
2 cases
1 cases
3 cases
3 cases
1cases
345 cases
6 cases
3 cases
3 cases
1 cases
|
|
|
1999
|
111LG Cable
111HYUNDAI
111LG Info. and Com.
111Kumoh NatĄŻl Univ.
111HEG
111Kumi High School
111LG Electronics
111LG Electronics
111Chang-Sa Project
|
111Alternative facility for Yong-Dong fuel,
besides
111C/R facility, duct facility, piping facility,
besides
111Piping facility in dormitory, besides
111HVAC facility in main hall, besides
111Main duct and piping facility in 2nd
factory, besides
111HVAC facility in main hall, besides
111Facility of waste heat recovery, piping
facility, besides
111Flatron line Extension, besides
111Piping facility in 3rd project(China),
besides
|
1 cases
1 cases
10 cases
7 cases
15 cases
1 cases
120 cases
85 cases
1 cases
|
|
|
2000
|
111LG Electronics
111HYUNDAI Electronics
111LG Micron
111LG Info. and Com.
111Chang-Sa Project
111Shang-Hai Project
|
111Piping and support in PDP HVAC facility(in
process), besides
111A1 processing water Improvement, besides
111FRP duct / piping, besides
111Piping in HVAC and sanitation facility,
besides
1114th Chang-Sa project facility, piping
facility, besides
1114th Shang-Hai project facility, piping
facility, besides |
150 cases
4 cases
20 cases
20 cases
1 cases
1 cases
|
|
|
2001
|
111LG Electronics
111LG Phillips CRT
111LG Phillips LCD
111LG Cable
111LG Micron
111Hynix Semiconductor
111Yun Sung Elec.
111Kum Jung Elec.
|
111piping in PDP HVAC facility/ piping in
You-Ki EL, besides
111CRT/CDT 21Ą± line(turn-key), besides
111P4 LCD environment and construction,
besides
111Optical fiber project U/T, besides
111C/R facility, besides
111C/R hook-up, besides
111Turn-key project in Shimchen in China(in
process)
111Turn-key project in Shimchen in China(in
process) |
1 cases
1 cases
1 cases
1 cases
1 cases
1 cases
|
|
|